Wednesday 10 February 2010

Strata 2


Finishing off the tiling : coving formed by hand between the tiles and bunding, then epoxy grout, and finally sand. Looks handsome, feels solid.


Prep work for the cask wash area - small sump under the grating needs a sump pump and rising main to carry effluent around the building to the main drain.  The floor already falls to the wall, so just the back section needed to be built up to fall back to the sump; away from the wall, the "uphill" section thins to zero. Our neighbour will be happy, as this means flooding will no longer drain through the wall into his property. There is a little trouble in the foreground, but that is easily dealt with...

No comments:

Post a Comment