Wednesday 17 March 2010

Gas dig started

Ironically, too soon - had been told they would start on Friday. Not quite a pleasant surprise, as they had been asked to dig only on Friday to avoid disrupting traffic. Fortunately this has not been a problem - yet - and the landlord has been very accommodating. Watch this space...

Tuesday 16 March 2010

What a mezz!

Ha! I should write headlines for The Sun...

Anyway, last major construction work underway - the mezzanine floor is going up. The area with the smart red floor will be the grain room, and adjacent will be lab & kitchen. We needed to level the floor in the grain room to avoid 1-tonne pallets rolling downhill, and the mezzanine pillars had to be adjusted to compensate. Fortunately Alf was on site with his cutter and welding kit to save the day.

Monday 8 March 2010

Ugly Duckling : a magical transformation

Well, we cheated. We were recommended to talk to JBJ Insulations, and their quote to custom build a cold room was not much more than it would have cost us to clean up and insulate the Ugly Duckling. Not to hurt her feelings, but this is more handsome and much better insulated,. so she is now unwanted, available to a good home - well, any home, so if anyone wants a tatty, weatherproof lockable 20 ft. container, do get in touch.

Thursday 4 March 2010

Loaded for shipping

The brewhouse has been loaded and is on its way; all fits rather neatly in a 40 ft. container. Now we have to start on the logistics of unloading it. I doubt our fork lift is up to it; anybody have a telescopic crane truck we can borrow for a day?

Monday 1 March 2010

From paper to reality

Just-about-final versions of the brewhouse drawings....

 
 


...and the real thing starts to take shape.


Excuse the brevity of recent postings, but I am starting to experience the reality of the old cliché "not enough hours in the day" - and as the other old cliché has it, a picture paints a thousand words, so complaints on a postcard to Anyone But Me.