Anyway, last major construction work underway - the mezzanine floor is going up. The area with the smart red floor will be the grain room, and adjacent will be lab & kitchen. We needed to level the floor in the grain room to avoid 1-tonne pallets rolling downhill, and the mezzanine pillars had to be adjusted to compensate. Fortunately Alf was on site with his cutter and welding kit to save the day.