Sight glasses for the liquor tanks arrived today - broken. This is the second set; the first arrived at the tank manufacturers broken also :
Investigations to ensue - in the meantime we will have to settle for blanking plates on the ports and manage without volume indicators for the liquor tanks.
Somehow the bracket on the outlet port of our large sump pump broke :
Fortunately Clarke's have a replacement - all it costs is time and money.
Thursday, 29 April 2010
Spot The Difference
Before :
After :
Give up?
It transpired that the kettle stack was just impinging on the line of a purling, which would make it tricky to run it through the roof - so the second picture shows the entire brewhouse moved three inches further away from the camera. Half a day spent undoing connections, shoving a few tonnes of steel into millimetre-precise positions, then reconnecting. Yes, Mr Smart-Arse, you are right - we should have spotted this before the final positioning was set - Oops! # 537, I suppose.
This "After" picture provides a better perspective :
The rest of the stack will be on site at 7 a.m. tomorrow, and will be in position sometime in the next few days - assuming good weather for roof work. Of course, after three weeks of glorious dry spring weather, we have just returned to traditional Cheshire drizzle now that the stack is ready. Oh pook.
After :
Give up?
It transpired that the kettle stack was just impinging on the line of a purling, which would make it tricky to run it through the roof - so the second picture shows the entire brewhouse moved three inches further away from the camera. Half a day spent undoing connections, shoving a few tonnes of steel into millimetre-precise positions, then reconnecting. Yes, Mr Smart-Arse, you are right - we should have spotted this before the final positioning was set - Oops! # 537, I suppose.
This "After" picture provides a better perspective :
The rest of the stack will be on site at 7 a.m. tomorrow, and will be in position sometime in the next few days - assuming good weather for roof work. Of course, after three weeks of glorious dry spring weather, we have just returned to traditional Cheshire drizzle now that the stack is ready. Oh pook.
Friday, 23 April 2010
Little things... please me
This insignificant pic means that we have full domestic plumbing - hot and cold running water and effluent pumped to drain. Complicated because there is no direct access to sewer, so we had to install a sump and pump and run the piping through the wall and along to an outside gully. Bigger things to come...
Monday, 19 April 2010
Oops! #2
Yes, it does seem unlikely that this is only the second mistake that has been uncovered so far - perhaps it would be better numbered as i.
Anyway, this shows the back side (fnarr fnarr) of the diverter panel, with the pumps fitted. The route to one of the 2" ports is blocked, and we need to modify the supplied kettle wort-out pipe with a couple of 45 degree elbows - a tricky alteration as the point connects at three separate points. Ho hum.
Friday, 16 April 2010
Final plumbing design - probably
This details the various connections and pumps between the brewhouse, liquor tanks, heat exchanger, & grist pump; all the internal brewhouse plumbing is already in place and not included here. If you spot anything missing, do let us know.
Old-fashioned tools in a new-fangled brewery?
Just run the old washing machine successfully for the first time in 16 years - compliments to Hotpoint. We use this for washing cloths, overalls, yeast, etc.
Wednesday, 14 April 2010
A Banner and A Beast
No longer hiding our light behind a bushel.
The beast is the pump for pre-mixing grain with hot liquor and pumping the wetted grist into the mash tun - it is a combination of Steel's masher and progressive cavity pump. I placed the cardboard box to give an indication of scale; useful, huh? 1.75m long, for those who like precise figures.